Heavy Industries, Cement & Steel

Posted on by adminForAMPSOLAR

Case Study: MP Birla Corporation.- 28MWp (Open Access), Payagpur, Uttar Pradesh

This plant is the first captive solar open access project.

AMPIN Energy Transition has set up a captive solar open access project in Uttar Pradesh. This project is spread across 98.11 acres of land in Payagpur, Uttar Pradesh.

The power supplied from this solar plant is used by MP Birla Corporation for meeting their energy requirements at 2 of their manufacturing facilities located in Kundanganj, Rae Bareilly.

The plant generates about 4,43,15,000 units annually and replaces almost 75% and 50% of power requirements at the 2 facilities of MP Birla Corporation.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

*

Copyright © 2024 AMPIN Energy Transition

Search